List of FNP systems Published ( 111 )
This database contains all of the paint systems which can be used within EDF for new construction, maintenance, and repairs.
FNP number
|
Index FNP
|
Review date
|
Company
|
Utilities type
|
Technical sheet (Fr)
|
Technical sheet (En)
|
Worst opinion |
Active codifications |
Action |
710 |
S001 |
06/01/2009 |
RESIPOLY CHRYSOR |
PARC NUCLEAIRE |
710.pdf
|
|
|
|
|
278 |
S001 |
09/08/2010 |
RESIPOLY CHRYSOR |
PARC NUCLEAIRE |
278.pdf
|
|
|
|
|
1028 |
S001 |
09/09/2010 |
RESIPOLY CHRYSOR |
PIC EPR |
1028.pdf
|
|
|
|
|
1046 |
S001 |
25/04/2013 |
PPG |
PARC NUCLEAIRE |
1046.pdf
|
|
|
|
|
1066 |
S001 |
03/10/2014 |
MAESTRIA |
Hydraulique |
1066.pdf
|
|
|
|
|
1067 |
S001 |
03/10/2014 |
MAESTRIA |
Hydraulique |
1067.pdf
|
|
|
|
|
11 |
S003 |
02/03/2017 |
RESIPOLY CHRYSOR |
PARC NUCLEAIRE |
11.pdf
|
|
|
|
|
1090 |
S002 |
17/05/2018 |
TEGG |
PARC NUCLEAIRE |
1090.pdf
|
|
|
|
|
1089 |
S002 |
02/04/2019 |
SIKA FRANCE |
PARC NUCLEAIRE |
FT Ind K.pdf
|
|
|
|
|
1075 |
S002 |
03/04/2019 |
RESIPOLY CHRYSOR |
PARC NUCLEAIRE, PIC EPR |
1075.pdf
|
|
|
|
|